PROPOSTA DE UM ÃNDICE DE CUSTO MÉDIO DE CONSTRUÇÃO E EQUIPAMENTOS PARA ESTAÇÕES DE TRATAMENTO DE ESGOTO

Alexandre Bevilacqua Leoneti, Marcelo Elias dos Santos, Sonia Valle Walter Borges de Oliveira

Abstract


The model to support decision making, "ETEX-FEARP", was based on decision making techniques in order to assist the urban planners with the choice of wastewater treatment plants (WWTP). The model uses 14 parameters to estimate the costs of implementation, operation and maintenance of eight different types of sewage treatment systems. The calculation of the eight systems’ costs was based on a construction cost table budgeted in 2004. In order to update the budgets, eight new tables of construction costs in different regions of Brazil were produced and the average costs were calculated for use in each of the 14items that the model uses in its calculations. The aim of this study was to propose an index of average cost for WWTP in Brazil which can be used by managers in decision making.

Index Terms - Wastewater treatment plants, Sanitation


Full Text: PDF

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

----------------------------------------------------------------------

ISSN 2317-3173

----------------------------------------------------------------------

Indexing

Logotipo do IBICT

----------------------------------------------------------------------

Scientific Societies and Directories

Logotipo COPEC Logotipo SHERO Logotipo da Capes

----------------------------------------------------------------------

Follow Us

Logotipo facebook Logotipo LinkedIn Logotipo Twitter

Â